4pc Front & Rear Wheel Hub and Bearings Kit

#80471-4

$153.75 $146.06

Estimated Delivery Tuesday 23 June
* Delivery times are estimates and may vary depending on location

Specifications & Details

Specifications:

Brand: Detroit Axle
Weight: 26 lbs
Dimensions: 7 × 13 × 11 in

Details:

  • Built under strict quality control standards; Tested for impact, wear and fatigue to ensure quality and durability; Manufactured in ISO9002 Certified facility
  • Undergo impact, wear, and fatigue testing to help ensure quality and durability

Compatible Vehicles

Ford

Taurus

Swipe left & right to view
additional chart details

Year Make Model Submodel Rear Brake Type Brake ABS
1996-1997 Ford Taurus G Drum Non-ABS
1996-1997 Ford Taurus GL Drum Non-ABS
1996-2000 Ford Taurus LX Drum Non-ABS
1998-2000 Ford Taurus SE Drum Non-ABS
1998 Ford Taurus SE Comfort Drum Non-ABS

Mercury

Sable

Swipe left & right to view
additional chart details

Year Make Model Submodel Rear Brake Type Brake ABS
1996 Mercury Sable G Drum Non-ABS
1996-2000 Mercury Sable GS Drum Non-ABS
1996-2000 Mercury Sable LS Drum Non-ABS
1998 Mercury Sable LS Premium Drum Non-ABS
2000 Mercury Sable LS Premium Drum Non-ABS

Warranty

LIMITED 10 YEAR WARRANTY - SEE WARRANTY DOCUMENT FOR DETAILS

Parts Covered by 10-Year Warranty Brakes: Brake Rotors & Drums CV Axles (Brand New): Brand New CV Axle Shaft Assemblies Racks & Pinions (Brand New): Brand New Rack & Pinion Assemblies Suspension: Adjusting Sleeves Ball Joints Center & Drag Links Control Arms Idler Arms Lateral Links Pitman Arms Sway Bar Links Tie Rod Ends Other […]